Detailed introduction

Construction method statement of bored pile

3.13 Temporary backfilling above pile casting level : After concreting, the bored pile will be curing at least 4 hours for temporary backill. After backfilling, it will cover the steel plate at the bored pile Page 6 of 8 4. Safety on site 4.1 Characteristics of bored pile Get price

Bored Pile Foundation Techniques and Benefits

2019/1/12Bored pile, also called drilled shaft, is a type of reinforced-concrete foundation that supports structures with heavy vertical loads.A bored pile is a cast-in-place concrete pile, meaning the pile is cast on the construction site.This differs from other concrete pile Get price

Guide to Tremie Concrete for Deep Foundations

6.2 Prior to Concreting 6.3 Tremie Equipment 6.4 Tremie Spacing 6.5 Initial Concrete Placement 6.6 Tremie Embedment 6.7 Concrete Flow Mechanisms 6.8 Flow around Reinforcement and Box-Outs 6.9 Concreting Records 7. Full Scale Trials 8. Quality Get price

Placing Concrete Under Water: 5 Methods

Concreting by tremie method requires high water/cement ratio for obtaining high consistency, which reduces the strength of concrete. But now, with the use of some plasticizer a concrete with as low w/c ratio as 0.3 or even less can be placed by tremie method. Get price

Construction of Pile Foundation at GALANDER

The tremie method of concreting is often employed when casting under water . This is a practical method of forming a pile shaft provided certain precautions are taken. It is essential that a slump mix greater than 175 mm is used, and that the tremie pipe Get price

Effects of polymer and bentonite support fluids on the

2015/12/1The two piles constructed using polymer fluids (P1 and P2) showed much stiffer load-settlement response than the pile constructed using bentonite (B1), and the projected long-term pile head settlements are 29.3, 24.0 and 50.5 mm for piles P1, P2 and B1 Get price

Micropile Installation Methods and Selection.ppt

1 Micropile Installation Methods and Selection Dr. Donald A. Bruce Agenda 1. Drilling in Rock and Overburden 111.1 Methods 1.2 Flushing Characteristics 1.3 Monitoring While Drilling 2. Grouting 2.1 Classification of Micropiles Based on Grouting Method Get price

Ultrasonic Integrity Testing for Bored Piles

The concrete flow patterns inside a reinforced bored pile are specific and reflect the conditions of both tremie placement process and resistances to flow by any surfaces within the excavation, as shown in Figure 1. It is well known that these factors give rise Get price

Construction of pile foundation by Rotary Method

Taking support of rods/guide casing/pile bore base will harm the quality of the pile so constructed. The tremie pipes shall be clean, watertight and of adequate diameter (usually 200mm dia) to allow the free flow of concrete. Before lowering, Get price

Procedure For Tremie Method For Concrete Pile Under

How To Remove Eject A Stuck Tremie Pipe For Concreting Pile Dec 14 2014nbspmiddot the concrete through pressure and weight displaces the water at the top and with this procedure the concreting of pile is done for lowering the tremie pipe we use mechanical Get price

Underwater Concrete

A.K. Al-Tamimi, in Developments in the Formulation and Reinforcement of Concrete, 20086.1 IntroductionUnderwater concrete "UWC" is one special type of high performance concrete used in the past, present, and in the foreseeable future as long as there is need to construct bridges, with foundations in soil with high water levels, and almost all off- and on-shore structures. Get price

Problems associated with the construction of bored cast

2015/7/7The pile bore is then drilled out to a nominal diameter. The open bore is supported by either the soil strength, a bentonite suspension or a steel liner. The reinforcement cage is lowered into the bore and then the concrete poured (either free-fall or through a tremie pipe). Get price

What is Bored Piling (Wet Process)? – PAT

During concreting the tremie pipe must stay in the trench until concreting is completely finished and concreting must be done continuously. Once the volume of concrete in the trench increases the tremie pipe must be taken out but always leaving at least 2m or 3-5m depending on the situation at hand, until all the slurry has been replaced by concrete. Get price

Ready mixed concrete for bored pile

2006/5/20You have to ensure that the bore holes dont cave-in (use bentonite/polymer) using sounding. Ensure that additional 10% cement on mix is added to compensate for the loss during use of tremie pipe. Check the slump and ensure it is not below 180mm. 200 mm is Get price

Pile Foundation

2020/2/21After this, concreting is carried out by using tremie, keeping its end always below the top level of rising concrete. The concreting is continued till a good quality concrete is seen at the top of the bore hole. After this, the tremie is removed and when the concrete Get price

Workability Requirements for Concrete in Bored Pile

We have discussed about many aspects of concrete for bore pile foundation. In bore pile construction relatively much greater slump is required as discussed previous. Here we will discuss about workability class A and B in relation to specific purposes of concreting in bore pile. Get price

Bored Pile Foundation Techniques and Benefits

2019/1/12Bored pile, also called drilled shaft, is a type of reinforced-concrete foundation that supports structures with heavy vertical loads.A bored pile is a cast-in-place concrete pile, meaning the pile is cast on the construction site.This differs from other concrete pile Get price

HOW CONCRETING IS DONE UNDER WATER BY TREMIE

2015/4/5Tremie method is the most acceptable method of concreting under water. In this method a tremie pipe is inserted in the water up to the point where concrete is going to be placed. Generally the diameter of a tremie pipe varies from 20 cm to 30 cm. Depending upon the depth of concreting under water we can add more tremie pipe by coupling it with one another. Get price

Concreting For Bore Pile Using Tremie

Concreting for bore pile using tremie - duolangch tremie concrete for deep foundations figure 14 cross section of a bored pile cast with differently dyed loads of tremie concrete concrete placement method by use of a tremie pipe in order to prevent the concrete Get price

Problems associated with the construction of bored cast

2015/7/7The pile bore is then drilled out to a nominal diameter. The open bore is supported by either the soil strength, a bentonite suspension or a steel liner. The reinforcement cage is lowered into the bore and then the concrete poured (either free-fall or through a tremie pipe). Get price

Concrete Pile Works and Load Testing Requirements

Pile Concreting Each pile shall be installed to the correct lengths as designed and approved by consultant or when the pile toe reaches the end socket in the recommended bearing strata. The contractor shall submit to consultant before start of piling works, a detailed description of the equipment, materials and procedures that will be used for the piling work. Get price

Bored Pile Foundation Techniques and Benefits

2019/1/12Bored pile, also called drilled shaft, is a type of reinforced-concrete foundation that supports structures with heavy vertical loads.A bored pile is a cast-in-place concrete pile, meaning the pile is cast on the construction site.This differs from other concrete pile Get price

Hydraulic rotary bored pile rigs for foundation engineering

The execution secuence is the following: Drilling and extraction of all soil leaving an open round hole, installation of steel cage, concreting by direct pouring through tremie pipe. When soil is not stable maybe required to use bentonitic muds or temporary casings. Get price

What is the function of introducing cement plug before

It is a common practice in the construction of bored piles by adding a cement plug before concreting of bored piles takes place. One of the possible explanations is that the cement grout serves as a barrier and protects fresh concrete from being washed away by water inside pile bore. Get price

Construction Method Statements_ Method Statement For

CONCRETING All pile shall then be concreted by using the 'tremie' method. Concrete of higher slump (=175mm+25mm) shall be used for 'tremie' method. The self-compacting mixed concrete will be discharged through a tremie pipe, which is lowered centrally to the bottom of Get price

Online customer service

Welcome ! If you have any questions or suggestions about our products and services,please feel free to tell us anytime!